The choices that shape your budget and timeline — layout, shower or tub, tile, waterproofing, ventilation and more — made before the old bathroom comes out.
A bathroom remodel goes smoothly when the big decisions are made before anything gets torn out. Changing your mind mid-project costs time and money. These are the decisions we work through with every client first.
1. Keep the layout or move things?
Keeping the toilet, sink and shower where they are is the biggest money-saver. Moving plumbing is possible, but it means more demolition, more materials and usually permits.
2. Shower, tub or both?
Tub-to-shower conversions are one of the most popular upgrades we do: a walk-in shower is easier to use, easier to clean and makes a small bathroom feel bigger. If it is the only tub in the house, think about resale before removing it.
3. Tile and finishes
Large-format porcelain means fewer grout lines and a cleaner look. For floors, choose a tile with good slip resistance. Pick your tile early — special orders can take weeks.
4. Waterproofing
This is the part you will never see and the part that matters most. Tile and grout are not waterproof on their own; what keeps water out of the walls and subfloor is the membrane behind them. We do not cut corners here.
5. Ventilation
In South Florida humidity, a properly sized exhaust fan vented to the outside is not optional. It protects paint, grout and cabinets and keeps mold from getting a start.
6. Storage and lighting
A vanity with drawers, a recessed niche in the shower and a medicine cabinet or LED mirror make a small bathroom far more usable. Plan the lighting now, while the walls are open.
7. Budget and timeline
Set aside a contingency of around 10 to 20 percent for surprises behind the walls, like old water damage. A full bathroom remodel typically takes a few weeks depending on the scope and material lead times.